Saturday, August 15, 2009

Carriage House, summer of 2009





This building is on the back lot of the house I have here in Corvallis. It is my summer project that I hope to have done before school starts back up in the fall. Work on this building is a whole rebuild (foundation, internal structure, plumbing, wiring, windows, insulation, and all the internal needs to make it livable again). When I got this building it was set up with two one bedroom residential units, one upstairs and one downstairs. When I am done with it it will be a two bedroom single residential unit.