Sunday, December 26, 2010
Entry Doors
Saturday, April 10, 2010
Upstairs floor... A little out of chronological order!
Almost forgot to mention that I have now finished the upstairs floor. Its been sanded and epoxied. Now to finish all the construction then give it one more light sand and then put a polyurethane layer over it to finish it off.
Bathrooms and sheet rock.
The downstairs bathroom mostly framed up.
Here is the upstairs bathroom framed in and nearly ready for plumbing and electrical.
And some of the Sheetrock in the second story. This needed to be put up prior to wall framing.
Friday, March 12, 2010
Finally a second floor...
A few more pictures, on the top, now it effectively has a second floor!! On the bottom some of the exposed beam work covered in car decking.
Ready for more insulation
Here are a couple of pictures of the east and west walls prior to insulation going in and getting sheathing.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Followers
Blog Archive
▼
2010
(5)
▼
December
(1)
Entry Doors
►
April
(2)
Upstairs floor... A little out of chronological o...
Bathrooms and sheet rock.
►
March
(2)
Finally a second floor...
Ready for more insulation
►
2009
(13)
►
October
(3)
►
August
(10)
About Me
wilber
View my complete profile